Home / Projects & Cases / Project portals / SSAB Luleå Minimill
Project portal · SSAB Luleå Minimill

Supplier to SSAB Luleå Minimill?

All suppliers covered by the project's requirements report deliveries, material and environmental data digitally under BEAst Supply 4.0. This is where you get started.
Get started now
Most suppliers are up and running within a weekReport directly from your phoneNo ERP system needed

What is your role in the project?

Choose your role to see what applies to you.

Material supplier
What you report
  • Delivery notes
  • Delivery information
  • Material data
  • Origin information
  • Climate data where required
What to expect

You report your deliveries digitally with delivery note and material data. We help you get started and check that everything comes through correctly before your first live delivery.

How to get started
Exact requirements are stated in the contract, purchase order or specific project instructions.
Additional requirements from contractors (MCC)

In addition to the project's common requirements, individual contractors (MCC) and contracts may include supplementary requirements for reporting, documentation, environmental data and site routines. You are responsible for complying with both the project requirements and the requirements of the contractor who ordered the delivery.

How do I get started?

1
Register your company
Company details and contact person.
2
Book an introduction meeting
We go through your role in the project and the setup that suits you.
3
Configure and verify
Together we make sure the right information is reported. A simple test is run before production starts.
4
Start reporting
After an approved test you start reporting continuously.
Already working with digital delivery notes? Then getting started is often quick.Do you have a system and don't know if it can send digital delivery notes? BEAst lists the system suppliers that state they are compatible: See BEAst's list of system suppliers
Communication standards:PeppolBEAst Supply 4.0

Most suppliers are up and running within a week.

Reporting requirements

Delivery data
  • Delivery number
  • Order number
  • Material type
  • Article number
  • Quantity
  • Date and time
Transport data
From laydown or within the project area
  • Haulier
  • Vehicle
  • Transport distance
  • Fuel type
Environmental data
Depending on contract
  • Fuel consumption
  • Machine hours
  • CO₂ emissions
  • Climate data for materials
Financial documentation
  • Digital delivery note
  • Invoice references
  • Receipt confirmations
All reporting is digital, for traceability, follow-up and efficient administration.

Frequently asked questions

No. Reporting can be done via Kubicom's web portal or mobile app.

Contact

GS
Gustav Sterling
Senior Project Controller · SSAB
LG
Lars Gunnar Lundvall
Product Owner Kubicom system · SSAB

About the project

SSAB is building a state-of-the-art fossil-free mini-mill in Luleå and will close the current blast-furnace-based production.

2,5 million tonnes/year
Capacity
−7%
Reduction of Sweden's total CO₂ emissions
4,5 billion €
Investment
2029–30
Start-up
What
New fossil-free mini-mill with two electric arc furnaces, advanced secondary metallurgy, a direct strip rolling line and a cold rolling complex. Capacity 2.5 million tonnes/year.
Why
Reduces Sweden's carbon dioxide emissions by 7%, strengthens SSAB's competitiveness and safeguards jobs.
Current status
Construction of the steel plant has begun with groundwork and preparatory compaction and piling.
Cost
Approximately EUR 4.5 billion, including a margin for unforeseen costs.
SSAB uses the Kubicom system to manage operational, financial and environmental data digitally according to the BEAst Supply 4.0 standard.

How delivery data flows

Every delivery to the Minimill project is reported digitally according to BEAst Supply 4.0 and sent via the Peppol network to SSAB — no paper, no manual entry.

Supplierapp · web
PeppolBEAst Supply 4.0
SSAB Minimilltracking · CO₂

Timeline

CompletedOngoingFuture
1
Investment decisionApril 2024
The Board decided to proceed with the investment in the new Minimill.
2
Environmental permitDecember 2024
The environmental permit for the new Minimill was approved in December 2024.
3
Construction startJanuary 2026
In January 2026, preparatory groundwork for the new steel plant begins.
4
Start-up and full capacity2029 – 2030
The new Minimill will be commissioned during 2029, reaching full capacity about a year later.

Links and information

Guides, maps and routines for everyone working in the project.

Overview

Rendering of the new fossil-free steel plant in Luleå. Image: SSAB.
Rendering of the new fossil-free steel plant in Luleå. Image: SSAB.

Need help getting started?

Kubicom helps suppliers in the project get started with digital delivery notes and environmental reporting according to BEAst Supply 4.0 – whether you already have a system or start from scratch.

Project portal delivered by Kubicom