Back to Projects & Cases
Project

Svevia: Digital delivery notes in the reconstruction of Tungelstavägen

On behalf of the Swedish Transport Administration (Trafikverket), Svevia is reconstructing road 257 between Västerhaninge and Tungelsta in Haninge Municipality. A technically wide-ranging project with digital delivery notes through Kubicom.

The project

Reconstruction of road 257, Tungelstavägen

The project includes a range of traffic-safety measures: a new signal-controlled junction, speed bumps, a left-turn lane, and adapted bus stops at Tungelsta school. The road is the only connection between Västerhaninge and Tungelsta, meaning the work must be carried out in stages with traffic flowing throughout the construction period.

It is a technically wide-ranging project involving road construction, retaining walls, medians, paving and extensive traffic control measures — exactly the type of civil engineering project where material flows are numerous and documentation is critical.

Kubicom in the project

Full control over deliveries in real time

Svevia uses Kubicom to collect digital delivery notes. The solution gives the project organisation full control over deliveries and material flows in real time, without manual paper handling. This simplifies follow-up, reduces the risk of errors, and contributes to smoother day-to-day operations on a site where precision and logistics are especially important.

Client: Trafikverket. The project is expected to be completed in summer 2027.

Want to be featured here too?

Want to join in and share your journey? Get in touch and we'll write the next customer case together.